Peninsula Place
On 2 February 2017, designs were revealed for Peninsula Place, a major new development planned for Greenwich Peninsula in London.
Designed by the Spanish architect Santiago Calatrava, his first work in the UK, the project is budgeted at £1 billion.
Developed by Knight Dragon, the scheme involves three tapering towers arranged like a crown and rising to 30-storeys, and including a 24 m (80 ft)-high winter garden, and a 152 m (500 ft)-long glass galleria. The project will also feature a tubular bridge with latticed sides linking it to the Thames.
The towers will rise above the tube and bus station, a theatre, cinema, bars, shops, hotel, a new performance venue, and up to 28,000 sq. m of office space. The idea is that people will emerge from the tube station into the glazed winter garden.
Peninsula Place forms part of regeneration projects on the site totaling £8.4 billion, masterminded by Allies and Morrison. They intend to design two residential blocks which, together with Calatrava’s towers, will contain 800 homes. However, only 200 of these will be ‘affordable’.
At the official unveiling, Knight Dragon Chief Executive Richard Margree said they aim to start work on the scheme either at the end of 2017 or beginning of 2018, with completion in 2021.
Calatrava said: "It is an honour to be designing such a piece of the fabric of London, a city I love. In designing this scheme, I have been inspired by London's rich architectural heritage and the very special geography of the Peninsula."
Despite being labeled a ‘starchitect’, he has received something of a reputation for his projects spiraling far beyond their original budget and schedule. Most recently, The Oculus in New York was completed $2bn over-budget.
Content and images courtesy of Knight Dragon.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”



























